The Appellant, Mr. Ellis Hamilton, requests that the Board of Supervisors overturn the Planning Commission's December 17, 2008, approval of Use Permit Major Modification No. P07-00299-MOD for the Bennett Lane Winery located on the east side of State Highway 128 approximately a quarter mile south of Bennett Lane. The Lynch Family Vineyards, LLC is the Project Applicant. The Major Modification request consisted of essentially three components: 1) construction of two new buildings and remodel of the existing building expanding the winery from approximately 8,900 sq. ft. to approximately 17,550 square feet; 2) expansion of parking facilities and winery-related site improvements; and 3) expanding marketing events and visitation. The Commission held three public hearings. The first occurred on July 16, 2008, which resulted in a continuance to August 18, 2008, to address public notice deficiencies. Based on testimony received at the August 18, 2008 meeting, the Commission determined that revisions to the Negative Declaration were necessary and directed staff to revise the Negative Declaration, recirculate it in accordance with CEQA requirements and return the matter to the Commission at a future date. On December 17, 2008, the Planning Commission held a duly noticed public hearing and considered the revised Negative Declaration, all written and verbal testimony from staff, the Project Applicant, the Appellant and members of the public and thereafter closed the public hearing. After careful consideration of the testimony presented, the Commission unanimously voted to approve the requested Project, but reduced the number of requested marketing events.
PROCEDURAL REQUIREMENTS:
- Staff report (based upon the documentary record) gives the procedural background of the case.
- Where the decision being appealed was made after a public hearing which was recorded, the Board is required to make its decision on appeal based on the following three sources of information unless the Board makes the determination under (3):
- The documentary record before the deciding officer or commission; and
- The transcription of the hearing(s) before the deciding officer or commission; and
- Such additional evidence that could not have been presented at the hearing before the deciding officer or commission.
- Where the decision being appealed was made after a public hearing which was recorded but at the beginning of the appeal hearing an interested party requests that the record be augmented or that the matter be heard de novo, the Board must decide first decide whether “good cause” (a substantial reason) exists to deviate from (2) to do one of the following:
- Permit additional evidence that could have been presented at the earlier hearing before the deciding officer or commission but was not in fact presented; or
- Hear the matter de novo.
Any motion made by a member to allow additional evidence beyond what was presented to the original deciding officer or commission or hear all relevant evidence (de novo hearing) should identify the specific facts presented that support the required good cause finding. If no member makes such a motion, the request will be considered denied.
- Conduct the appeal based on the evidence to be considered as decided in Steps 2 and 3.
- After the Board has heard testimony and received evidence from the Appellant, staff and interested parties supporting each, Chair closes the public hearing.
- A member of the Board makes, and a second member seconds a motion of intent to either deny or uphold the appeal and refer the matter to County Counsel’s office for preparation of a Resolution of Findings and Decision on Appeal.
- Chair calls for the Vote on the motion of intent to either deny or uphold the appeal and refer the matter to the County Counsel's office for preparation of a Resolution of Findings and Decision on Appeal.
On December 17, 2008, after considering all written and verbal evidence presented, the Planning Commission adopted the revised Negative Declaration and approved the Project subject to conditions of approval addressing building and site improvements, new marketing events and visitation at the winery. On January 2, 2009, subsequent to the Planning Commission's final decision, and within the prescribed 10-business-day period for appeal, an appeal was filed by Mr. Ellis Hamilton.
CURRENT STATUS AND ACTIONS REQUESTED BY THE BOARD OF SUPERVISORS: The matter before the Board is an appeal of the Planning Commission's approval of a Major Modification to an existing winery use permit. The Appellant asserts that the Project fails to comply with the 60/40 Production Facility to Accessory Use Ratio provided in County Code Section 18.104.200; relied on an improper water availability analysis; relied on an inadequate CEQA analysis; and, that the Planning Commission failed to consider existing violations of the winery's use permit.
County Code Section 2.88.090 provides for appeals of Planning Commission decisions and stipulates that the Board's appeal hearing be based on the documentary record, including transcripts of the Planning Commission's hearing, plus any evidence that could not have been presented at those hearings, unless the Board affirmatively permits any additional evidence based on good cause shown. Since the hearing, new evidence was submitted by the Appellant's hydrologist concerning water use. The Applicant's engineer has submitted additional evidence in response to the ongoing water use issue. In addition, the Appellant's and Applicant's attorneys have both submitted letters.
At the outset of the appeal hearing, the Board should first consider whether any new evidence should be admitted as part of the appeal hearing. There have been several letters submitted in connection with the appeal (as summarized below) that were not provided to the Planning Commission. After a determination regarding acceptance of new evidence, the Board should consider the basis for the appeal together with staff's response, as presented below. Following the appeal hearing, the Board may affirm, reverse, or modify the decision by the Planning Commission. Should the Board deny the appeal and approve the Project (as originally approved or as modified), the Board would also need to readopt the Negative Declaration. Upon closure of the public hearing, the Board should take a tentative action (i.e., a motion of intent) on the appeal and refer the matter to County Counsel's office for preparation of written findings.
STATED BASIS FOR THE APPEAL AND STAFF RESPONSE: The following outlines the Basis of the Appeal as contained in the Appellant's appeal submittal dated December 29, 2008. For convenience, staff has numbered each issue and provided a summary, but recommends the Board review the actual appeal for details. The following additional materials have been submitted in connection with the appeal but were not presented to the Planning Commission: 1) A letter from Dennis Jackson, Appellant's Hydrologist, dated February 24, 2009; 2) A letter from Paul Dohring, Appellant's Attorney, dated February 24, 2009; 3) A letter from Michael Smith, Applicant's Attorney, dated March 25, 2009; 4) Applicant's Engineer supplemental water availability analysis dated February 19, 2009; and 6) Applicant's Engineer water availability letter dated March 9, 2009. Background materials and staff reports from the Planning Commission's hearings are also attached, and the hearing transcripts have been provided to the Board.
Appeal Ground 1: The Water Availability Analysis is incorrect. The Riechers Spence report inadequately addressed the subject of groundwater availability and relied generally on the one acre foot/acre per year usage standard but this standard relies on outdated studies and cannot be reasonably relied upon today given the exponential increase in water usage in Calistoga over the last 45 years, the current global warming problem confronting the wine industry, and the documented boron intrusion in several local wells. In addition, if outdated water usage information is relied upon to support approval of the Project, the Phase I Water Availability Analysis produced by Riechers & Spence improperly relies on incorrect vineyard spacing data to conclude that existing water usage is only 3.16 acre feet per year.
Staff Response: The "Project" is a proposed expansion of the winery consisting of constructing new buildings, remodeling existing buildings and performing site improvements, and expansion of visitation and marketing events. The County's responsibility in reviewing this Project, both from County Code and CEQA perspectives, is to determine whether the Project's water use is consistent with standards and whether it may result in a potentially significant adverse impact on the environment. In order to determine whether a project may have a significant effect on the environment, the County treats the existing conditions as the environmental baseline against which the Project's changes are measured. When a proposed project will alter or expand existing activities, the impact assessment examines the incremental effect of the proposed change against the existing activities. (El Dorado County Taxpayers for Quality Growth v. County of El Dorado (2004) 122 CA4th 1591.)
The Planning Commission properly evaluated the groundwater effects of the existing winery operations against the proposed new uses and determined that the Project would not result in any additional water use and in fact would result in less water usage. The Commission relied on the revised Phase 1 Water Availability Analysis dated October 1, 2008, prepared by the licensed Project engineer (Riechers Spence) which demonstrated that the Project would result in a 0.13 af/yr reduction in groundwater over existing conditions. Because the overall water demand on the Project site is projected to be reduced as a result of the Project, this reduction would create a positive and beneficial effect on the environment and would also be consistent with County Code.
The Appellant appears to raise issues that are not directly related to the "Project" at hand. First, the Appellant claims the County's Phase 1 standard of one acre/foot per year per acre of land, known as the "fair share" standard, is outdated. For the purpose of this Project, the validity of the fair share standard is not applicable because the Applicant has demonstrated that the Project results in reduced water demand as a result of .50 acres of vineyard being removed to accommodate the expanded building areas and impervious site improvements. According to Project engineer, Riechers Spence, the amount of water used for the .50 acre of vineyard on an annual basis is much more intensive than the additional water use associated with the increased visitors and marketing events. The removal of .50 acre of vineyard equates to a reduction of .22 af/yr of water. County Public Works Staff reviewed the October 2008 Water Availability Analysis prepared by Project engineer Riechers Spence and concurred with the methodology used to determine existing and future water use. Even assuming arguendo that the Applicant's engineer and Public Works staff are wrong and the Appellant's hydrologist has correctly projected existing water use and the existing water use actually exceeds 1 acre/foot per year per acre, the "Project" approved by the Planning Commission still results in a net reduction of .13 af/yr in water use.
Second, the Appellant notes that existing vineyard spacing was not properly contemplated for purposes of determining groundwater use. Appellant contends that the vineyard has been replanted and that the Commission improperly relied on the 2002 Phase 1 Water Availability Analysis prepared for the Vigil Vineyards which was based on vineyard spacing of 6'x10' on seven acres whereas the actual, existing vineyard spacing is 5'x8' spacing. Appellant raised this issue at one of the public hearings before the Commission and as a direct result, the Applicant's engineer Riechers Spence submitted an updated Phase 1 Water Availability Analysis dated October 1, 2008. The updated Water Availability Analysis demonstrated that the existing vineyard water use of 3.16 af/yr would be reduced to 2.94 af/yr as a result of removal of .50 acres of vines. Furthermore, Appellant's assertion regarding vineyard spacing relate to the baseline or existing conditions on the site, and not impacts resulting from the "Project" subject to County discretionary review. The only change to the existing vineyard that is proposed is the removal of .50 acres of vines which as described above results in less water use.
Appeal Ground 2: The accessory use calculations for the winery are incorrect. The Applicant asserts that the total square footage of winery space used for accessory uses is 37.9 percent of the total square footage of the production facilities, thereby complying with the 40% limitation. This calculation is based on the total production facility square footage of 14,508 (sq. ft.) and alleged total accessory use space of only 5,504 sq. ft. Appellant asserts that the Applicant's argument is incorrect because it fails to include the approximately 8,000 sq. ft. courtyard enclosed by 19 foot high walls. Because this 8,000 sq. ft. enclosed courtyard will be used to host auction and marketing events, and not simply remain idle, this area must be considered when determining whether the Applicant has complied with the County's 60/40 Production to Accessory Use Ratio.
Staff Response: The Accessory Use calculation is set forth in County Code Section 18.104.200 and reads in full as follows:
Accessory structures related to wineries in AP/AW districts - Maximum square footage. The maximum square footage of structures used for accessory uses that are related to a winery shall not exceed forty percent of the area of the production facility. "Production facility" for the purpose of this section means crushing, fermenting, bottling, build and bottle storage, shipping, receiving, laboratory, equipment storage and maintenance facilities, but shall not include wastewater treatment or disposal areas which cannot be used for agricultural purposes.
The 60/40 Production to Accessory Use Ratio is based on uses conducted within structures and does not pertain to outdoor areas, including walled-in courtyards. It is stated quite clearly in Section 18.104.200 that the limitation on accessory use applies to structures. This standard has been consistently applied and interpreted by the Planning Department since 1990 as applying only to uses within enclosed structures. A walled-in courtyard, without a roof or any other form of conditioned spaced, is not considered a structure. It is a courtyard. Courtyards are fairly common features at wineries, especially those that are in close proximity to neighbors. The courtyard and other outdoor use areas have not previously been considered as structures subject to the 60/40 Production to Accessory Use Ratio and therefore the Planning Commission properly found the Project consistent with the 60/40 ratio.
Appeal Ground 3: Failure to Comply with Existing Conditions of Use Permit Approval. The prior Use Permit for the Leonardini Use Permit Application required the Applicant and future owners to comply with all applicable use permit conditions. As a result, Appellant asserts that the Planning Commission could not make the required use permit finding that the Project is consistent with existing zoning regulations because the current owner has been in violation of existing conditions of approval. In particular, the Applicant has failed to shield its outdoor lighting in a downward direction, failed to adequately screen its outdoor storage containers, and continued to use illegal sandwich boards and balloons to market the winery and Applicant should not be rewarded with an expanded entitlements when the Applicant cannot comply with existing conditions of approval.
Staff Response: The Appellant appears to be asserting that approval of a Use Permit Modification cannot and should not occur if a violation is alleged at the existing facility. In practice, the County has an established successful practice of violation abatement by encouraging applicants to voluntarily resolve use permit compliance issues. A primary tool in this voluntary compliance program is the Use Permit Modification process which allows applicants an opportunity to make positive project changes that address violations. Staff disagrees with the Appellant's assertion a use permit modification cannot be approved if a violation exists, because often times the modification process is integral to resolving violation issues.
In addition, for this case, the extent of violations claimed are relatively minor in comparison to Appellant's assertion that processing not occur until the violations are rectified. Prior to submittal of the proposed expansion, staff has had no previous record of any complaint occurring at this winery. Staff inspected the facility on several occasions during processing of the application. Staff observed grape picking bins stacked along the north property line and noted that the "by-prior-appointment" portion of the permanent signage was obstructed. (It is noted that grape bins are considered agriculture and are not subject to the outdoor screening requirement applicable to wineries. However, in practice, wineries have screened all permanent outdoor storage regardless of what is stored in the outdoor yard.) Staff did not visit the site at night, but did observe some unshielded outdoor work lighting. Photos of illegal sandwich board signs and balloons were submitted as part of the hearing process. After the violations were brought to the attention of the Applicant, the Applicant trimmed the landscaping so that all permanent signage is visible, has stopped using sandwich boards and balloon advertisements, and has committed to screen all winery-related outdoor storage and lighting as part of the proposed property improvements. Evidence that the violations had been corrected was provided to and considered by the Planning Commission on December 17, 2008, prior to the Commission's ultimate approval of the Project.
The Project before the Board of Supervisors is a proposed expansion of the existing facility. The findings required to approve the modification require the Board to find the Project, and not the existing condition, consistent with County zoning and the General Plan. As proposed and conditioned, the Project will comply with those standards, including rectifying existing condition inconstitencies. The Appellant has failed to demonstrate that the Project, as approved, by the Planning Commission would not comply with applicable standards.
Appeal Ground 4: The CEQA Analysis was Inadequate. The Appellant asserts that the Negative Declaration failed to adequately address serious groundwater supply issues, including actual water availability, water usage and Project water usage after expansion and likely replanting. Appellant further asserts that the Planning Commission failed to discuss available water sources should the groundwater supply be insufficient and that it failed to employ more current and reliable data to support a meaningless water usage standard based on water availability estimates from the 1960's.
Staff Response: A strong presumption in favor of requiring preparation of an EIR is built into CEQA. This presumption is reflected in what is known as the "fair argument" standard, under which a lead agency must prepare an EIR whenever substantial evidence in the record supports a fair argument that the project may have a significant effect on the environment. (Quail Botanical Gardens Found., Inc. v. City of Encinitas (1994) 29 CA4th 1597, 1602.) A "significant effect on the environment" is defined as a substantial or potentially substantial adverse change in the environment in any of the physical conditions within the area affected by the project including water. (CEQA Guidelines Section 15382) The purpose of CEQA is to protect the environment from future significant effects.
Here, the evidence is uncontroverted that the vineyard use generates the largest water demand on the Property and that the vineyard will be reduced in size by .50 acre to accommodate the winery expansion. The reduction in water use for vineyard irrigation more than offsets the small additional water demand generated by the increased marketing activities resulting from the Project. Because the evidence is uncontroverted that the Project will result in less of an impact on groundwater, it does not result in an adverse change on the environment and the Negative Declaration is adequate under CEQA. Likewise, because the Project will reduce water demand it cannot, by definition, make a considerable contribution to a cumulative groundwater impact.
Furthermore under Vineyard Area Citizens for Responsible Growth, Inc, v. City of Rancho Cordova (2007) 40 C4th 412 and the recent cases following it, the courts have clearly stated that CEQA only requires a discussion of replacement or alternative sources of water where the likelihood a water source availability is questionable or cannot be confidently determined. Here, the existing well has been serving the vineyard and winery and there was no evidence presented to the Commission that the existing well (or a future well) would not be able to accommodate the reduced water demand.
Finally, the Planning Commission heard and considered neighbor concerns regarding groundwater. These concerns, while certainly important and of interest to the County, consisted of vague, antidotal statements, speculation and unsubstantiated opinion. Complaints, fears and suspicions about a project's potential environmental impact do not constitute substantial evidence. (Porterville Citizens for Responsible Hillside Dev. v. City of Porterville (2007) 157 CA4th 885, 905.) None of the commenters articulated how the Project would likely adversely impact groundwater and none of the commenters complained that they personally had experienced problems with their wells going dry or having reduced flows. The study of groundwater is complex and technical and there are many reasons why wells go dry and why some properties require multiple well drillings before locating water. Although the Project would reduce groundwater impacts, out of an abundance of caution and to assuage the neighbors, the Planning Commission modified its standard well monitoring condition of approval to require that the Applicant commence regular well monitoring immediately and forward those results to the County upon request.
Please also see staff response to Appeal Ground No. 2, above.