Submitter

Director
Steven Lederer - Director - Environmental Management
Report By
John Kara, Jr - Environmental Health Manager - 259-8208
Agenda Date
Resolution / Ordinance
N
Category
SET MATTERS OR PUBLIC HEARINGS
Sub-Category
Subject
Amendments to Division II of Title 13 of the Napa County Code Relating to Sewage and Septic Systems

Recommendation

First reading and intent to adopt an ordinance amending various sections of Division II of Title 13 of the Napa County Code relating to onsite sewage disposal systems (commonly known as septic systems).
ENVIRONMENTAL DETERMINATION: The proposed action will not have a significant effect on the environment and therefore CEQA is not applicable. [See guidelines for the implementation of the California Environmental Quality Act, 14 CCR sec. 15061(b)(3)].
(CONTINUED FROM FEBRUARY 9, 2010; STAFF REQUESTS CONTINUANCE TO APRIL 20, 2010 AT 10:00 AM)

Summary

Division II of Title 13 of the Napa County Code regulates onsite sewage disposal systems within the unincorporated portions of the County. The existing ordinance was last amended in 1996 and parts are over 40 years old. The proposed amendments are necessary to conform with current requirements of the Regional Water Quality Control Board, to clarify current procedural requirements, to recognize recently developed technology, and to incorporate best management practices related to sewage systems. Staff notes that this amendment does not attempt to address regulatory requirements of Assembly Bill 885, which will be the subject of a future amendment following adoption of State Water Board regulations on that subject (should they ever succeed in issuing said regulations).

Major changes include recognition of alternative sewage treatment systems (also known as engineered systems), a better definition of a "failed" system, modification of the requirements for when a remodel triggers upgrades to a substandard system, authorization for private sector engineers to conduct site evaluations and percolation tests, codification of setback requirements from sewage systems to caves (previously implemented by policy memorandum in 2004 by Board direction), and authorization for the Department to approve unusual sewage disposal systems (such as composting toilets) at Government controlled parks. Minor editorial changes (such as updating references to the California Plumbing Code (CPC)) are also included.

PROCEDURAL REQUIREMENTS

  1. Open Public Hearing.
  2. Staff reports.
  3. Public comments.
  4. Close Public Hearing.
  5. Clerk reads the Ordinance Title.
  6. Motion, second, discussion and vote to waive the balance of the reading of the ordinance.
  7. Motion, second, discussion and vote on intention to adopt the ordinance.

Fiscal Impact

Is there a Fiscal Impact?
No

Impact

ENVIRONMENTAL DETERMINATION: The proposed action will not have a significant effect on the environment and therefore CEQA is not applicable. [See guidelines for the implementation of the California Environmental Quality Act, 14 CCR sec. 15061(b)(3)]. This determination is based on the fact the Regional Water Quality Control Board requires that any increase in wastewater flow to an existing onsite wastewater disposal system be considered a new wastewater discharge and comply with the same standards a s new onsite wastewater disposal system. The proposed ordinance amendments simply brings Napa County Code requirements for affected sewage systems into compliance with Regional Water Quality Control Board standards.

Background

Division II of Title 13 of the Napa County Code regulates onsite sewage disposal systems within the unincorporated portions of the County. The existing ordinance was last amended in 1996 and parts are over 40 years old. The proposed amendments are necessary to conform with current requirements of the Regional Water Quality Control Board, to clarify current procedural requirements, to recognize recently developed technology, and to incorporate best management practices related to sewage systems. Staff notes that this amendment does not attempt to address regulatory requirements of Assembly Bill 885, which will be the subject of a future amendment following adoption of State Water Board regulations on that subject (should they ever succeed in issuing said regulations).

Major changes include recognition of alternative sewage treatment systems (also known as engineered systems), a better definition of a "failed" system, modification of the requirements for when a remodel triggers upgrades to a substandard system, authorization for private sector engineers to conduct site evaluations and percolation tests, codification of setback requirements from sewage systems to caves (previously implemented by policy memorandum in 2004 by Board direction), and authorization for the Department to approve unusual sewage disposal systems (such as composting toilets) at Government controlled parks. Minor editorial changes (such as updating references to the California Plumbing Code (CPC)) are also included.

Section 1 of the ordinance clarifies that County authority to permit sewage systems locally is limited to those systems that do not exceed 5000 gallons per day (larger systems are permitted by the Regional Board) and updates references to the California Plumbing Code (CPC).

Section 2 recognizes and provides a definition of alternative sewage disposal systems.

Section 3 updates references to the CPC.

Section 4 provides a definition of a conventional sewage disposal system.

Section 5 provides an editorial definition of a "Division" of the Code.

Section 6 provides a helpful editorial reference to the proper section of the Code.

Section 7 provides an expanded and clarified definition for a "failed" sewage system.

Section 8 provides an improved definition of a grease interceptor and updates references to the CPC.

Section 9 provides a definition of a "qualified professional" for purposes of defining who can conduct work in accordance with the Code.

Section 10 provides a definition of a "service provider" for purposes of defining who can conduct work in accordance with this Code.

Section 11 deletes the reference to special design sewage systems (replaced by Section 2).

Section 12 defines when a sewage system upgrade is required when a residential remodel is proposed. Under the old requirements, several factors were used to determine the extent of septic upgrades necessary when a potential bedroom was added to the house and/or more than 50% of a home was remodeled. These factors included the original date the house was built, the soil conditions,depth to groundwater and the condition of the existing system. The upgrades to the system varied from merely having the system inspected to upgrading the amount of leachfield, to an entirely new code compliant system being required. These complex and confusing requirements were somewhat arbitrary and difficult to define and enforce. This resulted in some septic systems remaining substandard, even when major remodeling and additional wastewater flows were included in the construction project and other systems being completely replaced with a new system under very similar building projects. It has been replaced with the requirement to upgrade to a new system only if the remodel will result in additional flows, such as adding a bedroom (this is consistent with and required by current Regional Board guidelines). Major construction projects that do not result in additional flows are only required to have their current system inspected to ensure that it is in working order and to ensure that an adequate expansion area (also known as a reserve area) is available in the event the current system fails. Minor construction projects are exempted from these requirements. Updated CPC references are also included.

Section 13 provides updated references to the CPC.

Section 14 makes editorial changes to 13.24.020.B and provides updated references to the CPC.

Section 15 makes editorial changes and provides updated references to the CPC.

Section 16 provides updated references to the CPC.

Section 17 and Section 18 authorize qualified professionals in the private sector to conduct site evaluations and percolation tests, streamlining the process for accomplishing these tasks. 

Section 19 updates the table defining the clearances (also known as setbacks) between sewage systems and various structures and natural features. Table 13.28.040 of the existing sewage ordinance was created over 40 years ago and is significantly lacking in its ability to address all the features we regularly encounter which require protection from sewage contamination. In addition the current descriptions in the table do not clearly provide the level of detail to properly communicate which features require setbacks.

Therefore, a new table with an expanded list of features and more in-depth descriptions has been developed.  Although the table appears to be dramatically expanded and changed, the setbacks are consistent with current practice and the existing code with a few exceptions.

 

The following is a list of NEW setbacks to the table (these have been enforced through Departmental procedures but have not been previously codified):

 

  1. Ditches and culverts
  2. Caves (implemented by Board direction in 2004)
  3. Underground irrigation or drainage systems

The following is an expanded setback requirement for a currently listed feature:

 

  1. The setback from a sewage system to a well has been expanded to include a setback to abandoned wells or wells destroyed prior to February 2004. This is because, on this date, a change was made to the implementation of the well destruction regulations requiring the well casing to be perforated and or exploded so as to completely seal the internal and external conduits of a well to groundwater.  Prior to this date, only the internal conduits were sealed, resulting in a potential conduit to the groundwater remaining, even after the well had been “destroyed”.  It is necessary to maintain a setback to these “destroyed” wells for the protection of groundwater.  

All other setback features changes are only clarifications of the actual feature names.

 

Additionally, we have changed some of the setback distances in the Table.  The following is a summary of these changes with a brief explanation:

 

  1. Streams and creeks – the existing code states that the setback is 50 feet for a sewer line, 25 feet for a septic tank, and 100 feet for the disposal field.  Since the sewer line connects to the septic tank, it was impossible for a septic tank to be placed at the 25 foot setback and still have a legal sewer line attach to it.  Thus the septic tank setback has been changed to 50 feet to be consistent with the sewer line setback.  Also, the setback for a named river or creek that shows up as a blue line on a USGS map should be different than an intermittent drainage course that doesn’t receive water all year round.  The setbacks for non-blue line streams have been reduced accordingly. 
  2. The setback from a property line to a sewer line has been increased from “clear” to 5 feet to assure the sewer line remains on the appropriate parcel.  The setback from a septic tank to a property line has been increased from 5 feet to 10 feet to provide the necessary protections to ensure that potential contamination coming from the septic tank does not exit the property. It is typical to see sewage exiting from the lids of a septic tank during a failure and the additional setback will provide the necessary protection for the adjacent property.
  3. The setbacks for swimming pools have been increased slightly.  The current code does not have a setback from a swimming pool to a sewer line.  It is necessary to prevent a sewer line from running too close to or under a swimming pool due to contamination risks and therefore a setback of 5 feet has been included.  In addition, the setback from the septic tank to the swimming pool is currently 5 feet.  This is being increased to 10 feet for the same reason the setback was increased to the property line (protection of the pool from a possible sewage failure from the septic tank).
  4. The setback from a cut or embankment currently reads as: no setback to a sewer line, 5 feet to the septic tank, and 25 feet to the disposal field. The new table provides a 10 foot setback both for the sewer line and the septic tank. This is done to provide the necessary distance for protection against a sewer line break and also to assure that both the sewer line and the septic tank are placed in stable ground.  The distance from the disposal field has been changed to a calculation of 4 times the height of the cut with a maximum of 100 feet.  This provides a sliding scale for the setback congruent with the height of the cut or embankment.  By doing so, this provides a level of protection necessary for large cuts and embankments, yet does not place an unwarranted setback for smaller cuts.  This setback standard is used in several other jurisdictions and is consistent with the industry standard.

Section 20 provides an editorial update.

Section 21 provides updated references to the CPC.

Section 22 updates the language associated with alternative sewage treatment systems and codifies the Regional Board requirements that such systems (because of their complexity and likelihood of failure if not maintained), which are installed after certain dates, maintain an annual permit and a service provider.   

Section 23 provides the Department the option of approving unusual systems (such as composting toilets) for use at government run facilities such as county parks. This change was requested by the County Parks and Open Space District to accommodate certain remote, low use locations that would economically benefit from this flexibility.

Attachments