In March 1998, voters approved a half cent sales tax increase for flood control purposes known as Measure "A". The County and each City and Town are entitled to the proceeds from Measure "A" generated within their political boundaries for projects that were specified in the ballot measure. For the County, the measure reads:
Unincorporated Areas of Napa County:
- County unincorporated area flood damage reduction projects including elevating/relocating structures, including bridges, in the floodway and floodplain; and
- Agricultural watershed and stormwater runoff management improvements planned jointly by the agricultural industry, the County, the Napa County Resource Conservation District and the Department of Fish and Game, including projects which will:
- Reduce the amount of storm runoff and sediment in the Napa River System from agricultural lands; and
- Increase flood storage of the River system by the setback of active land uses from river and tributary banks.
Community of Angwin/Deer Park:
- Stabilization and enhancement of existing water reservoirs which shall be for the purpose of flood protection and water reliability; and
- Stabilize water quality.
Evaluation of Types of Projects and Benefits
Measure "A" does not identify specific projects for the County unincorporated area (including the Angwin/Deer Park and Berryessa sub areas), but rather specifies that projects must meet the above-stated objectives. In January 2008, staff presented and received approval from the Board on the Measure "A" Project Benefits and Priorities Matrix, which outlines the types of projects and benefits that meet the required Measure "A" objectives. The matrix also provides a relative priority ranking of projects based upon the ability of projects to cost effectively meet the Measure "A" objectives, while also considering the overall benefit to the public by applying the following criteria, as follows in order of relative importance:
- Projects which provide protection for health and safety;
- Projects which provide protection against possible future damage to property and/or the environment or protects natural resources; and
- Projects which enhance the environment.
The above proposed criteria are consistent with the intent of the measure and also with previous direction from the Board. The proposed evaluation of projects also considers the ability of Measure "A" funds to leverage other sources of funding for projects which meet the Measure "A" objectives. In this regard, project opportunities that come forward with supplemental funding from grants or from benefiting property owners, which only need to be matched with Measure "A", support a previously stated Board objective of stretching the Measure "A" dollars. Similarly, if other sources of funds are readily available for certain project types, this may factor into the relative importance of using Measure "A" funds for a particular activity.
Measure "A" Funding Agreement
In August 1999, a Funding Agreement was entered into between the County and the Napa County Flood Protection and Watershed Improvement Authority (NCFPWIA), which is the mechanism for the County to receive Measure A funding to conduct projects as specified in the Measure A Ordinance. The Funding Agreement is amended to provide funding as needed to conduct projects on an annual basis, or if necessary, as projects are identified. The County Funding Agreement was last amended on October 5, 2010; as of this 14th amendment, the NCFPWIA had authorized a total of $14,962,000 towards twelve approved Measure A projects in the County unincorporated area. Through the end of Fiscal Year (FY) 2010-2011 (6/30/11), the total expenditures on these projects are estimated to be approximately $11,349,086 as summarized in the following table:
| Project |
Total Authorized Funding through FY 2010-2011 |
Estimated Expenditures through 6/30/11 |
Deer Park Rd and Silverado Trail Road Elevation Feasibility* |
$ 179,000 |
$ 178,055 |
|
Lewelling Avenue Drainage Outfall* |
$ 798,000 |
$ 798,000 |
|
Milliken-Sarco-Tulocay Recycled Water Plan |
$ 2,199,000 |
$ 1,343,498 |
|
Angwin/Deer Park Water Supply Reliability Plan |
$ 2,229,000 |
$ 1,878,674 |
| Napa River Rutherford Reach Restoration |
$ 6,217,000 |
$ 5,367,000 |
|
Napa River – Oakville Cross Road to Oak Knoll Reach |
$ 490,000 |
$ 306,589 |
|
Flood Studies in the Unincorporated Area |
$ 400,000 |
$ 316,541 |
Zinfandel Lane Bridge Fish Passage |
$ 1,150,000 |
$ 332,505 |
| County-wide Water Conservation Program |
$ 420,000 |
$ 164,147 |
Coordination of Napa River Restoration Projects |
$ 70,000 |
$ 59,077 |
| Sulphur Creek Sediment Reduction/TMDL Project |
$ 210,000 |
$ 205,000 |
| Lake Berryessa Projects |
$ 600,000 |
$ 400,000 |
|
Total Authorized Funding to Date |
$ 14,962,000 |
$ 11,349,086 |
* Project Complete
A project summary and update on the status of the ten active projects being funded by Measure "A" is provided below. Staff is now requesting approval of Amendment No. 15 to the funding agreement with the NCFPWIA to continue funding of these previously authorized projects during FY 2011-2012. Each of the projects meet the objectives of Measure "A" and are consistent with the types of projects in the approved project evaluation matrix.
Status of Previously-authorized Active Projects and Additional FY 2011 Budget Allocations
MST Recycled Water Plan
The MST recycled water project is an effort to provide an alternative source of water to the Milliken-Sarco-Tulocay (MST) area to offset local groundwater use and restore the groundwater basin, which should also improve the health of the local streams and ultimately, the Napa River. The County has been working with the Napa Sanitation District (NSD) for the past several years to provide engineering, environmental review and assessment district engineering services so that MST area residents can decide if they are willing to fund the infrastructure improvements required to improve the local water supply shortage.
To date, the following has been accomplished: County staff has worked with NSD staff to determine an initial assessment district boundary and recycled water distribution system layout. NSD had a consultant complete a hydraulic analysis of the system (May 22, 2007) to estimate recycled water demands and verify that they have enough recycled water to meet the needs of the project. As part of this hydraulic analysis, cost estimates were developed for four different water usage scenarios. The County’s assessment district engineering consultant, Kristin Lowell, Inc. developed an initial benefit assessment methodology and initial assessments per parcel. In December 2007, the County Board of Supervisors voted to support the Napa Sanitation District’s efforts in the North Bay Water Reuse Authority Program (NBWRA - a large regional recycled water project also involving Marin and Sonoma Counties). Participation in the NBWRA has enabled the County/NSD to participate in the environmental document preparation for the overall regional project, which includes a project level review of the MST recycled water project (one of the regional components). The environmental impact report/environmental impact statement (EIR/EIS) was approved by the County and NSD in December 2009. Also in December 2009, the County Board of Supervisors approved continued participation in NBWRA in an effort to secure federal funding assistance, and approved an agreement with NSD reserving up to 1,000 AF per year of recycled water for the area.
Public outreach efforts continue at varying levels with community members, including the Napa Valley Country Club and “Groundwater Under Local Protection,” also known as GULP. Based on community feedback, the County has developed a revised proposal to address the groundwater problem in MST, including a smaller-scale recycled water project, development of a water conservation program for the area, investigation of potable water supply options, and review of existing ordinances and land-use policies in the area. The County has been working with NSD and their engineering consultant to evaluate this smaller recycled water project to serve the Napa Valley Country Club and interested vineyards – this work is now complete, and staff is working with the interested parties to develop funding alternatives.
In addition, an MST Ad Hoc Committee composed of two elected officials each from the County, the City of Napa and NSD has been formed and has been meeting regularly. This group is exploring additional alternatives to address the water supply shortage in the MST area, including potable water, water conservation and regulatory opportunities.
Measure "A" funds have been used to support continued participation in NBWRA in FY 2010-2011, exploring additional water supply alternatives and related activities, and to fund Phase 2 project design. The Phase 2 design is in progress and is being completed by NSD under contract with the County. The first phase of construction involving extension of the existing NSD recycled water pipeline from Napa Valley College to Napa State Hospital will be completed in summer 2011 funded in part by American Recovery and Reinvestment Act (ARRA) funds matched with Measure "A". An additional $614,000 is proposed in Amendment No. 15 to cover the County's share of construction costs and staffing support for this pipeline extension.
Angwin Water Supply
The County initially worked with area water purveyors to develop a prioritized list of projects that will improve water supply reliability to most, if not all, water users in Angwin/Deer Park. A “test case” project with Howell Mountain Mutual Water Company (HMMWC) was developed beginning in late 2006 to determine the procedures for completing projects with County Measure "A" reimbursement. This effort included researching the legal mechanisms to provide public Measure "A" funding to private mutual water companies, and the development and execution of a Memorandum of Understanding between the County and HMMWC (May 2007). Work on this “test case” project (Lake Henne Intake Pipeline and Orville Pump Station) was completed in September 2008, and final payment for the work was made by the County in October 2008.
After this “test case” project was completed, County staff began working with both HMMWC and St. Helena Hospital to implement significant projects for each entity based on master planning that each entity performed as part of their efforts to obtain Community Development Block Grant funding. Two high priority projects were: HMMWC’s Deer Park Supply Pipeline improvements and St. Helena Hospital’s Horizontal Well, Manifold and Transmission Line improvements. MOU’s were initially entered into with HMMWC and St. Helena Hospital to provide funding for the design phases of each project, both of which were completed by the end of June 2009. Better cost estimates were developed during the design phase of these projects and new MOU’s were developed for project construction. HMMWC awarded their construction contract in the spring of 2009 and construction was completed in the summer of 2009. In addition, HMMWC completed emergency waterline replacement work of a similar nature for which they have requested a separate MOU to receive funding for that emergency work.
County staff has held several meetings with the various water companies and community groups in an effort to gain consensus on an equitable method to provide funds to the individual water purveyors. At this time, consensus has been reached and all the water purveyors in the area are supportive of a proposed funding sub-allocation methodology based on the number of service connections. County staff is developing a Memorandum of Agreement (MOA) to formalize the funding sub-allocations so that each water purveyor can plan Measure "A" eligible projects.
County staff will continue to work with the Angwin/Deer Park water purveyors to prioritize and fund additional projects as Measure “A” funds are available. Once the MOA is completed, it is anticipated that new projects will be developed. Amendment No. 15 proposes an additional $820,000 in budgetary funding for FY 2011-2012 for Measure "A" eligible projects that are yet to be developed, but which the Board of Supervisors would need to approve through the project MOU process. This will streamline the process so that staff does not need to prepare a new County-Flood Authority Measure A Funding Agreement Amendment multiple times during the year as individual Angwin/Deer Park water purveyors develop their projects.
Napa River Rutherford Reach Restoration
The Board of Supervisors approved funding the Rutherford Reach project (aka Rutherford Dust Project) in 2004. This project is a public-private partnership where 22 riverfront landowners have entered into agreements with the County for restoration in the riparian areas of their property. In the case of agricultural parcels, which is the principal land use in this reach of the river, landowners involved in the project are volunteering to setback their existing agricultural uses to increase the riparian areas along the river. The project is also setting back agricultural berms, stabilizing eroding riverbanks, constructing bench cuts in some areas and constructing in-stream habitat enhancements. These improvements benefit the riverine environment and reduce flood damage potential throughout the reach. The project preliminary design was completed in 2008, an Initial Study/Mitigated Negative Declaration (IS/MND) was prepared and circulated for public comment, and project permits have been obtained with resource agencies. The entire project encompasses 9 linear areas (aka "reaches") of the river spanning 4.5 miles from Zinfandel Lane to Oakville Cross Road. The County has retained consultants to prepare construction drawings for the first four phases of construction. Construction began in summer 2009 on the east bank of Reaches 1 and 2 (Phase 1A). In 2010, construction was completed on the west bank of Reaches 1 and 2 ( Phase 1B) as well as both banks of Reach 3 (Phase 2). The design and construction of Reaches 1 through 3 was funded partially by grants from the State and Federal ARRA funds. The final design of Reach 4 is complete and ready for construction in summer 2011 and 2012. Two additional grants from the State and one from the Federal Environmental Protection Agency (EPA) will fund approximately half of the cost of Reach 4 construction, with the remaining funds coming from Measure "A". Also, Measure "A" has been used to design the next restoration priority, Reach 8 through the 35% design level.
Landowners have formed a Landowner Advisory Committee (LAC) to work with the County and the Flood Control District on Project maintenance. The Flood District created a Special Benefit Assessment District to provide for maintenance activities throughout the Rutherford Reach funded by the landowners in 2008.
Amendment No. 15 proposes additional funding for FY 2011-2012 of $1,140,000, which will be used to match the two newly awarded grants being used to fund Reach 4 construction and revegetation contracts in the 2011 and 2012 summer seasons and to complete the 100% design of Reach 8 and continue overall project permit compliance monitoring and reporting, and landowner liaison activities through the next year.
Napa River Oakville to Oak Knoll Reach Restoration
The Oakville Reach project is modeled after the Rutherford Reach project and aims to restore the 10 miles downstream of Oakville Cross Road. The project conceptual design was completed in 2011 funded by a $500,000 grant from the State obtained by the California Land Stewardship Institute (CLSI). The Board previously approved $215,000 of Measure "A" funds as a match for this grant. An additional $25,000 was budgeted for county staffing and oversight of this contract and to support the project moving forward once the conceptual design was completed.
In 2010, staff outlined the next steps on this project to be initiated during the current year, including the formal environmental review required under CEQA and landowner outreach activities to secure agreements to move forward with the detailed design of the project. An additional $250,000 in budgetary funding was approved for FY 2011 for these activities. Amendment No. 15 proposes to add $400,000 of budgetary funding which will match a recently awarded grant of $395,000 from EPA that will fund Phases 1 and 2 of the project, including Arundo removal in Reaches 7 through 10 and final design for the Yountville restoration node and other priority treatment areas between Oakville Cross Road and Yountville Cross Road. The proposed additional funding also provides budgetary funding for staff labor in coordination of the project through FY2011-2012.
Flood Studies in the Unincorporated Area
The storm of December 31, 2005 and other prior storms have highlighted several flooding and/or drainage related problems that impact County residents and property. To date, $400,000 has been approved by the Board to conduct multiple special flood studies throughout the unincorporated area. Initially this funding was used as a resource for staff to identify and begin evaluation of multiple problems reported by property owners. Flooding problems range from localized drainage concerns to larger scale issues associated with identified floodplain areas. As a result, the potential solutions to the problems also vary. The studies have generally been conducted according to a prioritization approach (e.g., number of properties/structures affected) that began based on the flood problems that resulted from the December 31, 2005 storm.
Four specific projects have been supported by the authorized funds to date as summarized below:
Milliken Creek Hydraulic and Restoration Studies
The County participated in funding a study of the hydrology, geomorphology and restoration opportunities for Milliken Creek between Westgate Drive and Atlas Peak Road. This reach of the creek traverses the residential communities in the Silverado Country Club area which were severely impacted by flooding and flood damages as a result of the December 31, 2005 storm. The study was conducted by Silverado Property owners Association (SPOA) with funding support by the County and the Silverado Country Club. Each entity paid $25,000 toward the $75,000 total cost of the study. The hydrologic study evaluated the previous study performed by FEMA as part of the National Flood Insurance Program, which is the basis of the current effective Flood Insurance Rate Map (FIRM) for the area. The December 31, 2005 storm produced more extensive flooding than the FEMA study predicted. The FEMA study used a particular frequency and duration of storm that was deemed to be statistically valid in making its determinations on flooding risk. However in review of this approach it was determined that a very intense storm of short duration such as was experienced in December 2005, would result in more significant flooding in the Milliken watershed. The results of this study were reviewed by FEMA and they used the results to update the FIRM in the area upstream of Atlas Peak Road.
The restoration opportunities study identified significant degradation in the creek due to the presence of nonnative invasive plants and also heavy handed approaches in dealing with bank erosion, such as significant use of rip rap. While such measures are sought by homeowners to prevent loss of stream bank, they often translate into problems for downstream neighbors. The study concluded that opportunities for properly designed biotechnical bank repairs exist and the replacement of nonnative, invasive vegetation with native species would also enhance the habitat value of the stream. A stewardship approach is being pursued by the various homeowners associations and the country club in coordination with the Flood Control District to address restoration of the creek.
The County retained a local consultant to review the recommendations of the 2007 flood study and perform additional analyses and cost benefit evaluations on how to mitigate flooding concerns in the area. This work is complete and the results will be communicated with the Silverado community for consideration of possible flood reduction projects. Staff has also been working with a consultant to evaluate the FEMA flood map in the area downstream of the Silverado reach of the creek to the Napa River, which also experienced significant flooding in 2005/2006. This work is ongoing.
Sunnyside and Deer Park Flood Study
Due to localized flooding in the area of Deer Park Road and Sunnyside Road that impacts both County roads and private properties in this area, the County retained an engineer to conduct a flood study to evaluate possible solutions. The study focused on the unnamed tributary to Canon Creek along Deer Park Road extending about 3,500 feet upstream of the intersection of Sunnyside Road. In this area there are 6 culverted locations to allow crossing of the creek. Three of these culverted locations are owned and maintained by the County and the rest are privately owned. The study was needed to evaluate if there would be a benefit to upsize the culverts owned by the County at Deer Park Road and at Sunnyside Road, possibly to reduce the amount of roadway flooding and also to reduce flooding on private property. The study showed that the stream leaves its banks in several locations in larger storms. At the first (upstream) County culvert at Deer Park Road, the culvert size cannot pass the 100-year discharge without roadway flooding. However, the study showed that if the Deer Park Road culvert were to be upsized to allow passage of the 100-year discharge, it would have a negative impact on downstream properties, particularly along Lilac Lane where private culverts exist that are also significantly undersized. Therefore the Deer Park culvert should not be upsized without the private culverts being upsized. At the downstream Sunnyside Road culvert, the study showed that upsizing the culvert would not provide significant improvement in the extent of private property flooding immediately upstream because the size of the channel is limited and has been encroached upon by property owner actions over time. Staff sent a letter presenting the results of the study to the affected property owners and offering guidance for property owners regarding private culvert improvements and/or channel improvements. However, some minor improvements at the Sunnyside and Deer Park Road culvert location are also planned for summer 2011.
House Elevations in Flood Prone Areas
Many of the homes in the unincorporated area that flood when larger storms occur are a result of the fact that the structures are located within identified special flood hazard areas (FEMA mapped flood zones). Generally the best approach to address this type of structural flooding is to elevate the structure such that the finished floor is above the 100-year (base flood) water surface elevation. For all new construction, or where substantial improvement of a structure is planned, County code requires that finished floors be constructed a minimum of 1-foot above the base flood elevation.
Grant programs are available to help homeowners with the cost of elevating existing homes. In 2006, in support of development of a grant proposal, County staff conducted outreach to homeowners that had reported flooding and also surveyed several structures to determine accurate floor surface elevations. The focus of this grant program was on homes within the unincorporated area that were identified by FEMA as having been flooded multiple times. After conducting FEMA-required cost benefit analyses, there were 8 structures where the benefits of elevation outweighed the cost of the project. The County applied for a grant to elevate these 8 houses. The total grant request was $1.1 Million; however, FEMA only obligated $375,000 to the Flood Control District for this grant. Environmental clearance was completed by FEMA for all 8 structures. Unfortunately, likely due in part to recent economic conditions, none of the FEMA-approved homeowners elected to move forward with house elevations under the grant program.
St. Helena Area Flood Damage Reduction and Restoration Opportunities
County residents along the eastern bank of the Napa River in the reach adjacent to the recently completed St Helena Flood Protection Project expressed concerns to County staff regarding the potential effect of this project on their properties. The City of St. Helena has conducted studies that demonstrate no negative impacts will result from their proposed project as compared to the existing condition. However, the project does not offer improved flood protection for the residents in the County unincorporated area. During large storms, the river floods a large area on the eastern bank, which is included in the floodway. Failure of the agricultural levee on the Napa Reserve property is common, leading to erosion and debris-related damages to the adjacent vineyard. Floodwaters cross Silverado Trail in two locations often scouring the shoulder on both sides of the roadbed and causing erosion in locations due to fast moving waters. Streambank erosion where the river leaves and reenters the channel is common. A prior feasibility study to evaluate roadway elevations was conducted; however this option was deemed financially infeasible. In addition, reductions in the scope of the St. Helena project made a roadway elevation project technically infeasible because of floodway restrictions.
Local unincorporated area residents formed a neighborhood group to work with the County on possible solutions to reduce flood damage and improve safety in this area during floods. Staff surveyed the finished floor elevations of several homes to evaluate flood risk. Outreach to these property owners is continuing now that St. Helena has finished their project and is working on a final FIRM revision.
Amendment No. 15 includes an additional $50,000 of budgetary funding to continue efforts on the above projects and potential additional flood mitigation projects during FY 2011-2012.
Zinfandel Lane Bridge Scour Protection and Fish Passage Design
The Napa County Resource Conservation District (RCD) completed a geotechnical study using grant funds from the Corps of Engineers to address erosion in the Napa River channel at the Zinfandel Lane bridge. The river bed at this location has been severely downcut immediately downstream of the bridge, which was constructed in 1913. Efforts over the years to address downcutting and protect the bridge piers included placement of concrete on the channel bottom. However, a 7.5 foot drop in the channel bottom has scoured out immediately downstream and underseepage of the concrete is occurring. This situation represents both a current barrier to fish passage and also a longer term concern for stability of the bridge. The study included a recommended conceptual design to protect the bridge and provide for fish passage. During FY 2010-2011, a grant was applied for and awarded to the County by the State Coastal Conservancy in the amount of $400,000 to partially fund project implementation. The FY 2010-2011 budget and prior Amendment No. 13 included $835,000 of Measure A funds to match grant funding based on the engineers estimate of construction costs. Environmental review under CEQA was completed in 2010 and final design is now complete and all project permits are in hand, enabling construction to begin as soon as the in-water work season for summer 2011 begins. The County recently awarded a contract for construction and based on the awarded contract, sufficient funding is in place and no additional Measure "A" funding is being proposed for this project in Amendment No. 15.
County-wide Water Conservation Program
For many years Napa County has been committed to the conservation of sensitive resources, has been at the forefront of protecting agricultural land, and has encouraged the conservation of natural resources including surface and ground water, soils, fisheries, wildlife, important plant species, and habitats. The County had never developed a formal water conservation program for the unincorporated areas, even though groundwater and privately developed surface water impoundments provide the water supply for the majority of Napa County’s rural residential and agricultural water users.
In April 2009, the Board of Supervisors requested that County staff develop a multi-year voluntary water conservation program for their consideration. Initially, staff was asked to look into the viability of a water conservation program for the MST area of the County, which is experiencing declining groundwater conditions, but because countywide sales generate the revenues for Measure A funding, and because the funds proposed to fund the proposed water conservation program will come from the unincorporated area of Napa County allocation, it makes sense to have a water conservation program that all County unincorporated area residents can benefit from. Staff reviewed standard water conservation industry practices, the programs of local cities and neighboring areas, and also consulted with the agricultural community, Napa County Resource Conservation District and the California Department of Fish and Game in formulating a water conservation program for the County unincorporated area.
The water conservation program was formally approved in the fall of 2009. Accomplishments to date include the distribution of water conservation devices, which are available to all County unincorporated area residents, both at the Flood Control District office and various community events. Water conservation signage has been developed for the MST area of the County. Staff organized an agricultural water efficiency workshop, a frost protection workshop and two Bay Friendly Landscaping certification workshops for local landscapers. A water conservation newsletter has been developed for distribution at Earth Day festivities and for mailing to the MST, Carneros and Lake Berryessa areas and a County water conservation web-page has been established.
County staff will continue with development of the various program elements for the remainder of the fiscal year and into the next fiscal year. Three years of funding (a total of $420,000) was authorized when the County Unincorporated Area Water Conservation Program was approved. The remaining available funding is adequate to support the ongoing and planned activities and no additional funding is being requested for FY 2011-2012.
Coordination of Napa River Restoration Projects
The Board approved Measure "A" funding for staff to seek facilitation support for overall coordination of the ongoing large-scale restoration efforts on the Napa River. Staff completed a Request for Proposals (RFP) process and selected the Napa County RCD and New Level Group team. The RCD-New Level Group team has assisted staff to increase inter-project collaboration for both landowners and technical project teams working on the Rutherford and Oakville restoration projects. Efforts to date have helped improve collaboration on these important projects, increase landowner awareness, develop improved grant funding strategies and align technical approaches and project goals. An additional budgetary allocation of $10,000 is proposed in Amendment No. 15 to continue these efforts through FY 2011-2012.
Lake Berryessa Watershed Improvement Projects
In accordance with the JPA, a portion of the unincorporated area's Measure "A" revenue is to be dedicated to the Lake Berryessa/Putah Creek watershed area. Through FY 2009, just under $1 million had accrued for use in the Lake Berryessa area, but no projects had begun. Specific projects were not identified in the original Measure A language, and projects in this portion of the County will not provide flood control benefits to the Napa River. Therefore, staff developed and presented for approval projects in the Lake Berryessa area based on the priorities set forth on January 13, 2009 by the Board for evaluating Measure "A" projects.
Project activities approved by the Board to date are directly related to improving and protecting water quality in Lake Berryessa and the Putah Creek watershed. Such projects are considered to be “high priority” according to the approved Measure A Project Benefits and Priorities for Napa County Unincorporated Area Matrix (dated 1/13/08).
A watershed sanitary survey is required by the California Department of Public Health to be prepared by water purveyors that use certain source waters. A watershed sanitary survey will need to be updated for Lake Berryessa, which is used as a water supply source primarily by Solano County agencies, but also by the Lake Berryessa Resort Improvement District and the Napa Berryessa Resort Improvement District, as well as other smaller water systems located adjacent to the Lake. The Board previously approved a budgetary level of funding of $50,000 to either prepare a simple Lake Berryessa Watershed Sanitary Survey for use by the small water systems around the Lake or to contribute the County's proportionate share to fund a larger effort that might be led by Solano County Water Agency. This funding remains in place and no additional funding is being requested at this time.
Another important water quality related activity is the evaluation of the wastewater treatment and disposal practices of the two Resort Improvement Districts and other small wastewater generators around the Lake in relation to current Regional Water Quality Control Board permit requirements. Treated wastewater overflow and/or controlled discharge events have occurred at both Districts in the past few years due in large part to excessive inflow and infiltration of storm water and shallow groundwater into the collection system and a consultant has been retained to evaluate several alternatives related to reducing the amount of storm water entering the collection system and/or the long-term disposal requirements of these waters. $500,000 was budgeted in FY2010-2011 to fund these activities and work is underway.
Finally, staff has begun siting and design for installation of three stream flow and rainfall gages to expand the Countywide Alert system into this portion of the County. A budget of $50,000 has been approved by the Board for this activity and the work is ongoing.
In addition to the above projects, there may be other Measure "A" eligible activities in the Berryessa area, such as the Irrigated Lands Waiver Program and the proposed Mercury TMDL. The Board approved a total budgetary level of funding of $600,000 in Amendment No. 13 for the described projects benefiting the Lake Berryessa area during FY 2010-2011. As part of Amendment No. 15, an additional $180,000 is proposed to continue the above projects through FY 2011-2012.
Sulphur Creek Watershed Sediment Reduction Project and Sediment TMDL Implementation Program
The Napa County Resource Conservation District (RCD), in partnership with Pacific Watershed Associates (PWA) and private landowners embarked on implementing a large-scale sediment reduction and storm water runoff management project in the Carneros Creek, Sulphur Creek and Heath Canyon Creek watersheds in the unincorporated area of Napa County. In its entirety, the project will protect water quality in the Napa River watershed by improving and otherwise upgrading priority rural road erosion sites which are contributing fine sediment to the Napa River and by preventing excessive fine sediment from entering Carneros Creek from a series of failed earthen dams on a tributary to Carneros Creek. All of the appropriate permits are in place and the project is being implemented in three phases. The first phase was completed in 2009 in the Carneros Creek watershed. The second phase, in the Sulphur Creek watershed, was implemented in 2010 and the third phase in the Heath Canyon Creek watershed will be implemented in 2011. Funding for project implementation is coming from a number of sources but it has been determined that insufficient funds are available to implement the project in its entirety without additional financial resources. Specifically, additional funds in the amount of $200,000 were needed by RCD to support implementation of the project in the Sulphur Creek watershed and the Board approved a match of funds from Measure "A" in this amount. This $200,000 will match over $700,000 already secured from the State Water Resources Control Board, the Department of Fish and Game, EPA, Scannell Properties, and participating property owners for implementation in all three watersheds. In addition, these funds will match significant financial contributions, in excess of $300,000, from the California Department of Conservation Watershed Coordinator Program and the Bay-Delta authority that supported the landowner coordination, watershed assessment, and watershed management planning tasks that made this large-scale water quality protection project possible. Without funding from Measure A, the work in the Sulphur Creek watershed would have been significantly reduced and an opportunity to implement projects that will significantly reduce the amount of fine sediment entering the Napa River from a major tributary would have been lost. Detailed “road-logs” for each of the sites in the Sulphur Creek watershed were completed and it is estimated that the treatments will prevent over 6,000 cubic yards of sediment from entering Sulphur Creek. The project, as designed, treats 9.5 miles of rural road, upgrades 31 stream crossings, replaces 14 culverts, treats 1 landslide, and installs 75 rolling dips and 14 critical dips. The scope of work is consistent with the adopted sediment TMDL for the Napa River and the sites can and will be used for demonstrations and workshops. The project is consistent with the types of projects that were specified in Measure "A" for the County unincorporated area. Specifically, this project is an “agricultural watershed and storm water runoff management improvement project,” planned by the RCD in collaboration with agricultural interests, Napa County and the California Department of Fish and Game, that will “reduce the amount of storm water runoff and sediment in the Napa River system from agricultural lands.” This type of water quality protection project is considered a “high priority” according to the Measure A Project Benefits and Priorities for Napa County Unincorporated Area Matrix (dated 1/13/08).
Sufficient funding remains to complete the approved scope of work for the Sulphur Creek project and therefore, no additional funding for the RCD match is being proposed in Amendment No. 15 for FY 2011-2012. However, staff is proposing an additional $20,000 of funding in Amendment No. 15 to provide staffing and match funds for the County's overall Sediment TMDL implementation program, which was selected to receive additional EPA grant funds under the San Francisco Bay Water Quality Improvement Fund. This is the same grant that is funding the above-stated grant amounts for the Rutherford and Oakville projects, and additionally will fund three additional activities: development of Ranch Water Quality Plans in partnership with University of California Cooperative Extension, assessment of the County's rural roads and stream crossings, and development of a TMDL Monitoring and Reporting Plan. All of these projects support the County's goals and objectives and regulatory obligations under the Sediment TMDL.
Summary of Proposed Additional Funding in Amendment No. 15
The following table summarizes the proposed additional funding included in Amendment No. 15 for each approved Measure "A" project and also the total funding allocation for all projects to date.
| Project |
Additional Funding Proposed in Amendment No. 15 |
Total Funding Allocations through FY 2011-2012 |
Deer Park Rd and Silverado Trail Road Elevation Feasibility* |
$ 0 |
$ 179,000 |
|
Lewelling Avenue Drainage Outfall* |
$ 0 |
$ 798,000 |
|
Milliken-Sarco-Tulocay Recycled Water Plan |
$ 614,000 |
$ 2,813,000 |
|
Angwin/Deer Park Water Supply Reliability Plan |
$ 820,000 |
$ 3,049,000 |
|
Napa River – Rutherford Reach Restoration |
$ 1,140,000 |
$ 7,357,000 |
|
Napa River – Oakville Cross Road to Oak Knoll Reach |
$ 400,000 |
$ 890,000 |
|
Flood Studies in the Unincorporated Area |
$ 50,000 |
$ 450,000 |
Zinfandel Lane Bridge Fish Passage |
$ 0 |
$ 1,150,000 |
| County-wide Water Conservation Program |
$ 0 |
$ 420,000 |
Coordination of Napa River Restoration Projects |
$ 10,000 |
$ 80,000 |
| Sulphur Creek Sediment Reduction/TMDL Project |
$ 20,000 |
$ 230,000 |
| Lake Berryessa Projects |
$180,000 |
$ 780,000 |
|
Total Authorized Funding to Date |
$ 3,234,000 |
$ 18,196,000 |
* Project Complete