Submitter

Director
Steven Lederer - Director of Public Works - Public Works
Report By
Frank Lucido - ENGINEERING SUPERVISOR - 259-8377
Agenda Date
Resolution / Ordinance
N
Category
CONSENT ITEMS
Sub-Category
Community Resources & Infrastructure
Subject
Hall of Justice Earthquake Repairs - Nacht & Lewis Architects PSA Amendment
Agreement
8287

Recommendation

Director of Public Works requests approval of and authorization for the Chair to sign Amendment No. 5 to Agreement No. 8287 with Nacht & Lewis Architects, Inc., increasing the amount by $429,500 for a new maximum of $1,211,218 and amending the scope of work to include additional architecture and engineering services for the Hall of Justice and Jail Annex earthquake repairs. 

Summary

Nacht & Lewis Architects, Inc. and their subcontractors have been working on repair plans for the Hall of Justice (HOJ) and the Jail Annex that suffered damage during the recent South Napa Earthquake. This amendment provides scope for additional design work resulting from planned investigation, further investigation of new areas, an allowance for repair design for undiscovered damage.  This amendment is intended to be the final major amendment capturing as much damage as possible to the HOJ and the Annex for the purpose of reoccupying all rooms of both buildings. However, if additional damage is discovered (not expected but possible), an additional amendment could be needed.
 
Nacht & Lewis Architects, Inc. is not a local vendor.

Fiscal Impact

Is there a Fiscal Impact?
Yes
Is it Currently Budgeted?
Yes
Is the activity Mandatory or Discretionary
Discretionary
Discretionary Justification
Approval of the Professional Services Agreement Amendment is required in order to repair parts of the Hall of Justice and the Jail Annex.
Is the General Fund Affected
Yes
Future Fiscal Impact?
Construction costs will be incurred in Fiscal Year 2015/2016, 2016/2017 and possibly 2017/2018.
Consequences if not approved
The Hall of Justice cannot be reoccupied and damage to the Annex will go unrepaired which will have severe impact to the County operations.

Impact

ENVIRONMENTAL DETERMINATION: The proposed action is not a project as defined by 14 California Code of Regulations 15378 (State CEQA Guidelines) and therefore CEQA is not applicable.

Background

Nacht & Lewis Architects, Inc. and their subconsultants have been providing architectural/engineering services to complete repair plans for the Hall of Justice (HOJ) and the Jail Annex that suffered damage during the recent South Napa Earthquake. Nacht & Lewis Architecture, Inc. was selected through a qualifications based selection process and entered into a contract with the County in October 2014 for this work after a fee was negotiated in accordance with County and State requirements.

The County decided to proceed with a phased approach that focused on stabilizing the building and completing high priority repairs as fast as possible. The first agreement with Nacht & Lewis concentrated on evaluation of the main structure and was amended to include repair of loose grout in the 3rd floor HOJ cells once this damage was identified.  Amendment No. 2 added design scope for repair of the HOJ main structure and second floor as well as scope for further structural investigation of interior walls. Design for the main structures repairs is nearly complete and these repairs have been approved by FEMA so this work is expected to bid soon. Amendment No.3 was a no cost amendment that refined billing rate details. Amendment No. 4 provided scope for additional design work needed to repair the HOJ 3rd floor grout joints, floor and wall cracking inside the corridors, dining hall, courtyard, and public bathrooms. Amendment No. 4 also included scope for repair design of HOJ 3rd floor interior structural connection problems that were discovered after completing the investigation required by Amendment No. 2. 

This Amendment No. 5 focuses on surveying and documenting damage followed by design to allow repair for all remaining damage in both buildings.  Once this design is completed it will be submitted to FEMA for their approval followed by bidding. 

Attachments

There are no attachments to this item