Submitter

Director
Steven Lederer - Director of Public Works - Public Works
Report By
Shaun Horne - Watershed & Flood Cont Res Spc - 229-8624
Agenda Date
Resolution / Ordinance
N
Category
CONSENT ITEMS
Sub-Category
Community Resources & Infrastructure
Subject
Amendment No. 3 to Napa County Agreement No. 7837 with ESA-PWA - Napa River Oakville to Oak Knoll Restoration Project Group B & D Design and Construction Support Services
Special Instruction
Please return two signed agreements to the Flood District office.

Recommendation

Director of Public Works requests approval of and authorization for the Chair to sign Amendment No. 3 to Agreement No. 7837 with ESA PWA, increasing the maximum compensation by $559,660 for a new maximum of $3,035,660 and amending the scope for the purpose of providing additional design work for construction Group B and D, archeological surveys, hydraulic analysis and construction support of the Napa River Restoration Oakville to Oak Knoll (OVOK) Project.

Summary

A Professional Service Agreement with ESA PWA, for Napa River Restoration Oakville to Oak Knoll (OVOK) Project design was approved by the Board on September 25, 2012.  Amendment No.1 of the ESA PWA agreement was approved by the Board April 21, 2015, Amendment No. 2 of was approved by the Board on November 24, 2015. These amendments expanded the scope of specific work items for the purpose of providing additional biological monitoring, environmental permitting, archeological surveys, cultural resource recovery, construction support, technical design and engineering support for Group A (Sites 23-21) and C (Site 14) of the OVOK Project.  The proposed Amendment No. 3 further expands the scope of specific work items for the purpose of providing engineering support to advance Group B (Sites 15-20) and D (Sites 1-15) to the 65% design level, including topographic surveys, geotechnical analysis, revegetation designs, archeological surveys, and to support construction services for OVOK Group C (Sites 12 and 13).

ESA PWA is not a local vendor.

Fiscal Impact

Is there a Fiscal Impact?
Yes
Is it Currently Budgeted?
Yes
Is the activity Mandatory or Discretionary
Discretionary
Discretionary Justification
Amendment 3 to the agreement is needed to advance the next phase of the OVOK Project to the 65% design level. OVOK Group B and D are currently designed to the 30% level and additional analysis of biological resources, geotechnical conditions, cultural resources, hydraulic analysis and landowner coordination is necessary to keep the project moving forward to the permitting and construction phase.
Is the General Fund Affected
Yes
Future Fiscal Impact?
This is a multi-year project and the term of the agreement extends through June 30, 2019.
Consequences if not approved

Potential loss of landowner involvement, investment in conceptual and preliminary design as well as further degradation of the Napa River can occur.  River restoration and flood damage reduction efforts along the Napa River in the OVOK area cannot proceed further in the absence of additional designs and technical studies.   

Impact

ENVIRONMENTAL DETERMINATION: The OVOK Project is the subject of a Mitigated Negative Declaration (SCH No. 2014012057), which was adopted by the Napa County Public Works Director on April 11, 2014. According to the Mitigated Negative Declaration, the proposed project would have, if mitigation measures are not included, potentially significant environmental impacts in the following areas: Aesthetics, Biological Resources, Transportation/Traffic, Cultural Resources, and Air Quality. This project site is not on any of the lists of hazardous waste sites enumerated under Government code section 65962.5.

Background

In 2007 the California Land Stewardship Institute (CLSI) received funding from the California State Water Resources Control Board and Napa County (Measure A) to prepare an enhancement plan for 9.5 miles of the Napa River between the Oakville Crossroad bridge and the Oak Knoll Avenue bridge (OVOK). The efforts of CLSI, the Napa County Resource Conservation District and Phillip Williams and Associates (now known as ESA PWA) are summarized in the Napa River Restoration: Oakville to Oak Knoll Project Final Concept Plan (Concept Plan) which was published in April 2011.

The OVOK Project is the downstream continuation of restoration of the Napa River Rutherford reach which was completed in 2015. The County has completed the environmental review of the OVOK Project as required by CEQA, and the Mitigated Negative Declaration (SCH No. 2014012057) was adopted by the Napa County Public Works Director on April 11, 2014. During the development of the OVOK CEQA document the twenty three restoration sites were organized into Construction Groups A-D.

On March 14, 2012, staff published a Request for Qualifications (RFQ) for engineering firms or teams of firms to refine conceptual designs for the entire project and develop design documents for the first implementation phase, prepare regulatory permit applications, and assist with construction administration services for the OVOK Project. Staff reviewed four proposals and conducted interviews with three firms on April 24, 2012. ESA PWA was chosen as the most qualified firm based on their experience with the conceptual design of this project and other similar projects. 

A Professional Service Agreement with ESA PWA, for Napa River OVOK Project design was approved by the Board on September 25, 2012. The scope of work included design support for the CEQA process, which has been completed, and funds to support this design work were approved as part of Amendment No 18 of the County-Flood Authority Measure "A" funding agreement.

Approval of Amendment No. 1 to Agreement 7837 with ESA PWA was approved on April 21, 2015 to include additional design support to complete final designs for OVOK Group A (Sites 21-23) , advancement of Group C (Site 14), construction support for OVOK Group A, additional biological monitoring, and technical engineering services. Funds to support this design work were approved as part of Amendment No. 23 of the County-Flood Authority Measure "A" funding agreement. 

Construction of Group A began in 2015, supported by a grant from the EPA and matched with Measure A funds.  Group C (Site 14) is also being supported in part by a grant from the EPA and matched with Measure A funds. During initial stages of construction, evidence of archaeological/cultural resources were discovered within the Group A sites.  In accordance with Project permits, ground disturbance activities were temporarily stopped and a plan was developed to delineate the lateral and vertical extents of the finding.  County staff and ESA personnel consulted with appropriate regulatory agencies and tribal monitors in the development of the discovery plan to facilitate project implementation.  

Approval of Amendment No. 2 to the Agreement with ESA PWA was approved on November 11, 2015 to include additional design support for the purpose of carrying out cultural resource recovery work, archeological monitoring services, additional permit coordination, construction support, design advancement of Group C (Sites 11-13) and technical design support necessary to facilitate the completion of construction of OVOK Group A and C (Site 14). Funds to support this design work were approved as part of Amendment No. 24 of the County-Flood Authority Measure "A" funding agreement.  Construction and revegetation of Group A was completed in May of 2017. OVOK Group C (Site 14) construction was completed in November of 2017 and revegetation will be carried in 2018.

Approval of Amendment No. 3 to the Agreement with ESA PWA is requested at this time to fund additional engineering services to advance Group B (Sites 15-20) and D (Sites 1-10) to the 65% design level, including topographic surveys, geotechnical analysis, archeological surveys, and to support construction services for OVOK Group C (Sites 12 and 13). OVOK Group C (Sites 12 and 13) are being funded by grants from the California Coastal Conservancy, Regional Water Quality Control Board, California Department of Fish and Wildlife, and County Measure A. Construction is anticipated to start in July of 2017 and continue through November of 2018. Funds to support the design work and construction were approved as part of Amendment No. 26 of the County-Flood Authority Measure "A" funding agreement and are included in the FY 2017-2018 Public Works budget. 

Although ESA PWA is not a local vendor, staff recommends that the additional required services be performed by them as the chosen designer of the project through a request for qualifications process and because of the specialized expertise that they bring to the project.

Attachments

There are no attachments to this item