Executive Director requests approval of and authorization for the Chair to sign Amendment No. 1 to Agreement No. 19 (NCFPWIA) with the City of Calistoga extending the term through June 30, 2005 for services relating to the City’s Kimball Reservoir Maintenance Dredging Project.
Agreement No. 19 with the City of Calistoga funds the Kimball Reservoir Treatment Plant Maintenance Dredging Project from the proceeds of Measure A Flood Protection Sales Tax. No additional funds are required at this time. However, the term of the Agreement requires extension through June 30, 2005.
The proposed action is not a project as defined in Section 15378 of the CEQA Guidelines, which define a project as an action which has the potential for resulting in either a direct physical change in the environment or a reasonably foreseeable indirect physical change. Accordingly, no additional CEQA review is required at this time.
This amendment will extend the expiration date of the Agreement to fund the City of Calistoga's Kimball Reservoir Maintenance Dredging Project (Project). This is an approved project for the City of Calistoga (City), in accordance with Section 8 of the Measure A Ordinance (Ordinance). The Project is not intended nor designed to expand water capacity for growth or new development. The original agreement was approved by the Board on January 6, 2004.
PROJECT SCOPE: The dredging project will provide stabilization and enhancement of Kimball Reservoir (Reservoir), thereby enhancing flood protection and water supply reliability for the City. The Reservoir is located north of the City of Calistoga (City) and is one of the City's primary water supplies. The watershed for the Reservoir covers an area of approximately 3 square miles. The Kimball dam was constructed for flood control and to provide a water supply for the community of Calistoga in 1939. It was raised in 1948 to increase the storage capacity of the Reservoir. The storage capacity of the Reservoir is approximately 409 acre-feet at the flashboard elevation of 579 feet. Since its construction, the Reservoir has accumulated sediment and debris, especially during periods of high runoff. Based on 1991 Reservoir sounding data, the accumulation of sediment has reduced the storage capacity to approximately 312 acre-feet at the flashboard. The continuing siltation in the Reservoir has degraded water quality and is negatively impacting the operation of facilities at the intake tower. The lowest elevation valve on the intake structure is now buried in silt. Operation of this valve to release water in an emergency situation, while still possible, will become increasingly problematic as silt continues to accumulate.
FUNDING USE: Accumulated sales tax revenues imposed by the Measure A Ordinance commencing in 1998 will fund this contract. Funds provided under this agreement are being used for assistance in completing the CEQA documents, securing permits, grant funding applications and the delivery of a bid package to complete the dredging of the Reservoir by September 2004. The City of Calistoga has entered into an agreement with Harrison Engineering for these services.
This amendment was approved by the City on June 15, 2004. Staff recommends approval of this agreement.