Measure A Background
In March 1998, voters approved a half cent sales tax increase for flood protection, preserving ground water integrity, reducing sediment in the Napa River system, and for maintaining the reliability of the water supply for the existing Napa County population as of the effective date of the Ordinance. The Ordiance, known as Measure "A", entitled the County and each City and Town to the proceeds from Measure "A" generated within their political boundaries for projects that were specified in the ballot measure. For the County, the measure reads:
Unincorporated Areas of Napa County:
- County unincorporated area flood damage reduction projects including elevating/relocating structures, including bridges, in the floodway and floodplain; and
- Agricultural watershed and stormwater runoff management improvements planned jointly by the agricultural industry, the County, the Napa County Resource Conservation District and the Department of Fish and Game, including projects which will:
- Reduce the amount of storm runoff and sediment in the Napa River System from agricultural lands; and
- Increase flood storage of the River system by the setback of active land uses from river and tributary banks.
Community of Angwin/Deer Park
- Stabilization and enhancement of existing water reservoirs which shall be for the purpose of flood protection and water reliability; and
- Stabilize water quality.
Joint Powers Agreement
In November, 1998 a Joint Powers Agreement (JPA) was entered into by the County, Flood Authority, Flood District and each city. The purpose of this JPA was to set forth a whole host of operating policies and criteria regarding the equitable distribution of the sales tax revenues to each agency, debt financing for projects in the plan, and how to handle additional revenue in the event of sales tax growth, and the possibility of State flood control subventions for the Napa Flood Project. The JPA made specific arrangements for each agency to loan a portion of its Measure "A" funds in the first seven years to the City of Napa for use in constructing its flood control project, to be paid back with interest during the remaining 13 years of the tax. In addition, the County agreed to allocate all of its sales tax revenue from the vicinity of the City of Napa to the City's flood project with reimbursement to come only if additional revenues are available after the project is paid off. The "Napa Vicinity" allocation accounts for about 60% of the County's tax revenue.
Revenues and Actual Expenditures
In accordance with the JPA, the County share of sales tax distributions was set at 9.6% through the end of FY 2006, and then varies according to the actual percentage of the taxes collected within the unincorporated area as compared to the entire County. The actual 2006-2007 percentage for the unincorporated area was 16.94% and the forecast for 2007-2008 is 17.94%.
At the end of FY 2007, the County share of accumulated sales taxes was $10.5 million (M), with an available cash balance of $3.97M after taking into consideration the loans to the Napa Project and expenditures on projects in the unincorporated area. By the end of the current Fiscal Year 2007-2008, it is anticipated that the County will have an available cash balance of $6.1 million. Assuming continuation of collecting the most recent percentage of total taxes (17.94%), the County unincorporated area should receive approximately $40M in Measure "A" tax revenues by the year 2018. Based on the current projects authorized by the Board and anticipating the funds needed to take those projects to successful completion, it appears that no more than $20 million will eventually be expended, leaving room for the Board to approve additional projects or programs in the future.
The JPA established a specific formula for allocating the unincorporated County portion of the revenue to three different geographical areas based generally on the amount of revenue generated in those areas. They are:
- Angwin/Deer Park - 17%
- Berryessa Watershed - 7%
- Balance of County - 76%
In total, the County has expended approximately $1.69M through the end of FY 2007 for the unincorporated Projects. A summary of the expenditures and previously approved levels of funding, by project, is provided below, along with staff's projections of future expenditures needed to complete the project:
Angwin/Deer Park Projects ($6.8M Projected Available):
Angwin/Deer Park Water Supply Reliability Plan - $121,542 has been spent through the end of FY 2007. This is an ongoing project, with total funding of $429,000 authorized to date. An additional $300,000 is being requested for the upcoming FY 2009 budget cycle. At this time staff is anticipating completing design and environmental review work with this requested budget increase. Prior to going out to bid on any new project in the Angwin/Deer Park area utilizing Measure "A" funds, community meetings will be held to gain community consensus on the proposed funding allocation and project prioritization. Because two of the largest water purveyors in the Angwin/Deer Park community have identified these respective projects as their most critical needs, it is reasonable to allocate funding for the design and environmental work required for these projects because the amounts of money being allocated are within each agency's fair share of the money available. Additional funding requests will be made in the future for actual project construction.
The projects for which design and environmental review work will be started are the Deer Park Supply Pipeline Upgrade for Howell Mountain Mutual Water Company and the Horizontal Well Field, Manifold and Transmission Upgrade for St. Helena Hospital.
Berryessa Watershed Projects ($2.8M Projected Available)
No projects conducted to date.
Balance of County Unincorporated Area ($30.4M Projected Available)
A total of $1,563,793 has been expended on the following projects:
St Helena Deer Park Road/Silverado Trail Feasibility Study (Completed) - $178,839
Lewelling Ave Outfall (Completed) - $797,600
Millken-Sarco-Tulocay (MST) Recycled Water Plan - $129,577 has been spent through the end of FY 2007. This is an ongoing project, with total funding of $529,000 authorized to date. An additional $300,000 is being requested for the upcoming FY 2009 budget for the County's participation in the North Bay Water Reuse Authority (NBWRA) Program with Napa Sanitation District (NSD), and specifically for the purpose of keeping future Federal and State funding options open and to have the environmental documentation completed for the proposed MST Recycled Water Project.
Napa River Restoration - Rutherford Reach (aka Rutherford Dust Project) - $362,594 has been spent through the end of FY 2007 from the approved budget of $1,292,000, for Preliminary Design (Phase 1) and to cover the projected cost of the County's matching share of Final Design and construction of Reaches 1 and 2 during FY 2008 and 2009 (a portion of Phases 2 and 3). The request for an additional $80,000 is for coordination and review of the project environmental review under CEQA and project management to transition the project to the Final Design and Construction stage ($30,000), and for assessment engineering services to set up a Special Benefit Zone Project and Assessment for project maintenance under the Napa County Flood Control District ($50,000). An additional $6 million is projected to be needed over the next 6 years in order to complete construction of the remaining phases of the project, assuming that a like amount of grant monies will be secured.
Oakville Cross Road to Oak Knoll Avenue Sediment Reduction and Habitat Enhancement Project- $74,173 has been spent through the end of FY 2007 from the approved budget of $190,000. The request for an additional $50,000 is for review of the Conceptual Design currently being prepared by the California Land Stewardship Institute and to support overall project management and to increase the scope of work to include Conn Creek into the hydraulic model. This project is in the conceptual design stage but it is similar in nature to the Rutherford Reach project. It is anticipated that Measure A expenditures towards eventual construction costs may be approximately $8.6 million (to be matched one for one) over the remaining time period of Measure A.
Special Flood Studies in the County Unincorporated Area - $21,010 has been spent through the end of FY 2007 from the approved budget of $200,000. By the end of FY 2008 it is estimated that approximately $100,00 will be spent. There are no additional funds being requested for this Project, at this time. These special flood studies are beginning to yield area specific information and appear to be valuable. Staff capability appears to be limited to expending no more than approximately $100,000 per year and therefore a continuation of this program at that expenditure level through the end of the Measure A program may be warranted. It is expected that the outcome of these studies will result in recommendations regarding improvements to be made. Whether those improvements can be funded entirely, partially or not at all with Measure "A" funds has yet to be determined and will have to be decided on a case-by-case basis.